here is what i have and what i am wanting to do,
as it "stands" now i have a rohn 20 tower at 40ft when i installed this
tower about 10 years ago i didnt use a base plate so she is in 3x3x4 or
close to that, in concrete since then i have become a ham and noticed the
need for more tower work, what i am wondering is unstack the one cut it
flush with the concrete make a hinge plate and bold it down to the existing
concrete using heavy duty lag bolts? will this hold? we do not have alot of
wind or ice here. i do not have this one guided off no room for it so
getting down to it will it hold with out guy wires at a hight of 40ft,
bolted down with lag bolts that i will have to drill into the existing
concrete?
well what do you think
chris
_________________________________________________________________
Mortgage rates near historic lows. Refinance $200,000 loan for as low as
$771/month*
https://www2.nextag.com/goto.jsp?product=100000035&url=%2fst.jsp&tm=y&search=mortgage_text_links_88_h27f8&disc=y&vers=689&s=4056&p=5117
_______________________________________________
_______________________________________________
TowerTalk mailing list
TowerTalk@contesting.com
http://lists.contesting.com/mailman/listinfo/towertalk
|