When I put up my rhon 25, I used a plumb bob. After the tower was up I
installed guy wires (not really needed) as I tighted up the guys I used the
plumb bob to make sure it was straight.
 I ran the string about 1/2 inch from one of the legs off the outside of the
tower. It worked great for me.
 Besides I could put a pully on one of the guy lines with a rope attached
and haul stuff up the tower with out it banging on the side of the tower or
haveing my wife hold the other end of a rope etc.
 She just sat in a chair and watched and once in a while would have to get a
tool for me and I would haul it up my little tram.
  Thanks for your help..
 Joe



> I would bet he is not that far off.  It is fairly easy to get a tower
plumb
> using a simple level.  I went an extra step and also used a plumb bob to
set
> the first 50 feet.  After that you can sight from the tower base to make
> sure the sections above are in line.
>
> 73, Keith NM5G
>

_______________________________________________



_______________________________________________
TowerTalk mailing list
TowerTalk@contesting.com
http://lists.contesting.com/mailman/listinfo/towertalk

<Prev in Thread] Current Thread [Next in Thread>