Adrian...
Clive's comments are on-point. However, if you try to mix at the
site, you will have to schlepp both bags of 'crete and water. It
might be easier to mix below, and have a powered means to transport
mixed concrete. IF that proves true...then it may be as well to have
redi-mixed 'crete delivered, and spend the energy transporting batches
to the foundations, instead of mixing.
Do NOT partially pour a foundation in batches, and expect to have anything
but
conformally shaped rocks holding up your tower. Depending on the time
between
pours, it likely won't bond properly.
N2EA
jimjarvis@ieee.org
> Hi Guys
> Over here in the UK, I am about to "plant" 4 towers, and pour C35 Grade
> Concrete in the bases. Anyone know what is the setting time for this
> stuff,
> and can it poured in one or two lots ? Getting this amount of concrete
> onto
> the site is not easy. I live up a mountain, with access limited to 4 Wheel
> Drive vehicles, and certainly a Truck will be near impossible to get on
> site, let alone a Ready Mix Concrete one ! So I may have to mix on site,
> and
> pour in batches.
>
> Comments ?
>
>
> Adrian MW1LCR
>