Ricky,
My situation was:
84' Trylon self-supporting bought used (3 years old) - $600
5' x 5' x 5' hole dug with shovels by two local Latinos - $100 plus $10
chicken lunch
Concrete pumper to get concrete from street to hole - $300
Concrete - 9.75 yards (I dug the hole out more myself, thus the 9.75
yards) - $350
Crane with operator to raise assembled-on-ground tower - $300
Tower climber - $200
Case of beer for me and my buddies - $20
The look on the neighbors' faces - Priceless
Brian K. Harris, WA5UEK
"Ricky Scott" <rickw7psk@gmail.com>
Sent by:
towertalk-bounces@contesting.com
2006-03-09 02:17 PM
To
towertalk@contesting.com
cc
Subject
[TowerTalk] Cost of installing a tower.
Classification
Ok, Hypothedical situation.
Ham Station A is going to install a T500 40Ft Trylon tower,
Thats 1150 plus 625 shipping.
Assuming 200 bucks for 1 day digging with a rented back hoe for the hole.
How does one estitmate total cost from there.
Im swimming in numbers.
BTW Local Concrete is 75 a yard and 85 with fibre.
_______________________________________________
_______________________________________________
TowerTalk mailing list
TowerTalk@contesting.com
http://lists.contesting.com/mailman/listinfo/towertalk
_______________________________________________
_______________________________________________
TowerTalk mailing list
TowerTalk@contesting.com
http://lists.contesting.com/mailman/listinfo/towertalk
|