| To: | "TowerTalk List" <towertalk@contesting.com> |
|---|---|
| Subject: | Re: [TowerTalk] RE: Installing Tower Bolts |
| From: | "FireBrick" <w9ol@billnjudy.com> |
| Reply-to: | FireBrick <w9ol@billnjudy.com> |
| Date: | Fri, 1 Oct 2004 12:28:21 -0500 |
| List-post: | <mailto:towertalk@contesting.com> |
|
As a licensed mason contractor I was frequently asked to help DIY hams pour bases. wire tying rebar to the bolts is a must, both around the perimeter and with diagonals across the center. In addition, I used bolts above and below the bolt template, well tightened. Those tricks took a few minutes to prepare, but saved many minutes during and after the pour. ----- Original Message ----- From: "Bill Turini" <wtu@cypress.com> To: <towertalk@contesting.com> Sent: Friday, October 01, 2004 12:18 PM Subject: [TowerTalk] RE: Installing Tower Bolts There was a comment made regarding welding tower bolts together at the base to ease installation. I ran into problems with my recent installation and have a plan for my next tower base. :-) _______________________________________________ See: http://www.mscomputer.com for "Self Supporting Towers", "Wireless Weather Stations", and lot's more. Call Toll Free, 1-800-333-9041 with any questions and ask for Sherman, W2FLA. _______________________________________________ TowerTalk mailing list TowerTalk@contesting.com http://lists.contesting.com/mailman/listinfo/towertalk |
| <Prev in Thread] | Current Thread | [Next in Thread> |
|---|---|---|
| ||
| Previous by Date: | [TowerTalk] RE: Installing Tower Bolts, Bill Turini |
|---|---|
| Next by Date: | Re: [TowerTalk] RE: Installing Tower Bolts, Terry Dunlap |
| Previous by Thread: | [TowerTalk] RE: Installing Tower Bolts, Bill Turini |
| Next by Thread: | Re: [TowerTalk] RE: Installing Tower Bolts, Terry Dunlap |
| Indexes: | [Date] [Thread] [Top] [All Lists] |