Since there is a 3 Inch taper to the section (8 ft)...I was going to add
a 1.5 inch block to the end of a 4 ft level to compensate for the
taper....
Has this been done in the past?
Thanks...
Rich
-----Original Message-----
From: Dave N0RQ [mailto:n0rq-1@dfwair.net]
Sent: Sunday, October 26, 2003 1:15 AM
To: Rich Hallman - N7TR
Cc: towertalk@contesting.com
Subject: Re: [TowerTalk] Leveling a Trylon Base?
I could never quite figure a good way to plumb-bob the thing, though I'm
sure it could be done.
For mine, I used a good 4' level, held it across the 3 faces (one at a
time, of course ;-), resting on the bolts, and adjusted with thin steel
or aluminum plates under the legs as needed.
Dave N0RQ
----- Original Message -----
From: "Rich Hallman - N7TR" <rich@n7tr.com>
To: "Tower Talk" <TOWERTALK@contesting.com>
Sent: Saturday, October 25, 2003 6:48 PM
Subject: [TowerTalk] Leveling a Trylon Base?
Almost ready to pour bases for two T-400 80 Ft Trylons....
What is the best way to level the base section since the legs taper
inwards?
Thanks...
Rich
N7TR Web Site - Updated 20 Oct
www.n7tr.com <http://www.n7tr.com>
N7TR DX-Cluster
<telnet://dxc.n7tr.com>
_______________________________________________
See: http://www.mscomputer.com for "Self Supporting Towers", "Wireless
Weather Stations", and lot's more. Call Toll Free, 1-800-333-9041 with
any questions and ask for Sherman, W2FLA.
_______________________________________________
TowerTalk mailing list
TowerTalk@contesting.com
http://lists.contesting.com/mailman/listinfo/towertalk
_______________________________________________
See: http://www.mscomputer.com for "Self Supporting Towers", "Wireless Weather
Stations", and lot's more. Call Toll Free, 1-800-333-9041 with any questions
and ask for Sherman, W2FLA.
_______________________________________________
TowerTalk mailing list
TowerTalk@contesting.com
http://lists.contesting.com/mailman/listinfo/towertalk
|