Jerry:

1) Keep it wet for at least a week the longer the better.

2) No problem in stripping the forms off after 2 weeks. The concrete will be at 
about 2/3 strength by then. Use this as the same time to keep the pour 
moistened.

73

Hank Lonberg, P.E.,S.E. / KR7X
Lonberg Design Group, Ltd.

> Got my concrete in the ground today....I know it's 4 weeks until it reaches
> full strength, but two questions:
> (1) How long do I have to keep wetting it down?
> (2) how long before I can remove the above-ground wood forms and the plywood
> that the J-bolts are suspended from?
> 73,  Jerry K3BZ
> 
> _______________________________________________
> 
> See: http://www.mscomputer.com  for "Self Supporting Towers", "Wireless 
> Weather 
> Stations", and lot's more.  Call Toll Free, 1-800-333-9041 with any questions 
> and ask for Sherman, W2FLA.
> 
> _______________________________________________
> TowerTalk mailing list
> TowerTalk@contesting.com
> http://lists.contesting.com/mailman/listinfo/towertalk
<Prev in Thread] Current Thread [Next in Thread>