It must be different in Northern Ireland UK. I quote from the forms I
received...
"Enclose three copies of each of the following:
a) Site Plan to scale, clearly showing the location and placement of the
proposed structure and all relevant constructions within 500m
b) Detailed scale engineering drawings showing any foundations or anchor
points.
c) Detailed drawings showing the construction and methods of construction of
the proposed structure (it the case of masts, towers etc please also state
any additional information such as wind load factors )......."
And so on, lots snipped out.
--
George Shaw
eMail: george.shaw@xlsolutions.com
eMail: george.shaw@ukf.net
Fax/Voice Mail: +44 (0) 87 0133 6126
Mobile: +44 (0) 77 4036 1163
ICQ#: 1741675
-----Original Message-----
From: Roger Borowski [mailto:K9RB@bellsouth.net]
Sent: 25 November 2001 21:45
To: george.shaw@ukf.net
Subject: Re: [TowerTalk] Plans and drawings
Usually detailed scaled drawings for obtaining a permit here in the states
means a scaled pictorial of placement of the tower on your lot in respect to
the lot lines and other structures. Nothing to do with the tower
construction itself. 73, -=Roger Borowski-K9RB
List Sponsored by AN Wireless: AN Wireless handles Rohn tower systems,
Trylon Titan towers, coax, hardline and more. Also check out our self
supporting towers up to 100 feet for under $1500!! http://www.anwireless.com
-----
FAQ on WWW: http://www.contesting.com/FAQ/towertalk
Submissions: towertalk@contesting.com
Administrative requests: towertalk-REQUEST@contesting.com
Problems: owner-towertalk@contesting.com
|