This is a multi-part message in MIME format.
------=_NextPart_000_0002_01BED6B9.34E26A60
Content-Type: text/plain;
charset="iso-8859-1"
Content-Transfer-Encoding: 7bit
If you have tested the feedline to the phasing harness and it is okay, I
would use the WX0B stackmatch, and replace at least both the feedlines from
the two yagis to the location where the switchbox will be located. These
two 52 ohm lines must be the same length, but do not have to be the same
length as the phasing sections you are replacing. This will also give you
some switching options on the stack. You must also have a control cable for
the Stackmatch box.
73 John N5CQ
-----Original Message-----
From: owner-towertalk@contesting.com
[mailto:owner-towertalk@contesting.com]On Behalf Of Josh Logan
Sent: Sunday, July 25, 1999 2:51 PM
To: towertalk@contesting.com
Subject: [TowerTalk] Phasing Harness problem
This entry is made for friend not subscribed to Tower Talk
My friend has 8 over 8 Telrex monoband stack on hill top.-
this Telrex system is from 20 years ago using hardwired
------=_NextPart_000_0002_01BED6B9.34E26A60
Content-Type: text/html;
charset="iso-8859-1"
Content-Transfer-Encoding: quoted-printable
<!DOCTYPE HTML PUBLIC "-//W3C//DTD HTML 4.0 Transitional//EN">
<HTML><HEAD>
<META content=3Dtext/html;charset=3Diso-8859-1 =
http-equiv=3DContent-Type>
<META content=3D"MSHTML 5.00.2314.1000" name=3DGENERATOR></HEAD>
<BODY bgColor=3D#ffffff>
<DIV><FONT color=3D#0000ff face=3DArial size=3D2><SPAN =
class=3D470231120-25071999>If you=20
have tested the feedline to the phasing harness and it is okay, I would =
use the=20
WX0B stackmatch, and replace at least both the feedlines from the two =
yagis to=20
the location where the switchbox will be located. These two 52 ohm =
lines=20
must be the same length, but do not have to be the same length as the =
phasing=20
sections you are replacing. This will also give you some switching =
options=20
on the stack. You must also have a control cable for the =
Stackmatch=20
box.</SPAN></FONT></DIV>
<DIV><FONT color=3D#0000ff face=3DArial size=3D2><SPAN=20
class=3D470231120-25071999></SPAN></FONT> </DIV>
<DIV><FONT color=3D#0000ff face=3DArial size=3D2><SPAN =
class=3D470231120-25071999>73=20
John N5CQ</SPAN></FONT></DIV>
<DIV><FONT color=3D#0000ff face=3DArial size=3D2><SPAN=20
class=3D470231120-25071999></SPAN></FONT> </DIV>
<BLOCKQUOTE style=3D"MARGIN-RIGHT: 0px">
<DIV align=3Dleft class=3DOutlookMessageHeader dir=3Dltr><FONT =
face=3DTahoma=20
size=3D2>-----Original Message-----<BR><B>From:</B>=20
owner-towertalk@contesting.com =
[mailto:owner-towertalk@contesting.com]<B>On=20
Behalf Of </B>Josh Logan<BR><B>Sent:</B> Sunday, July 25, 1999 2:51=20
PM<BR><B>To:</B> towertalk@contesting.com<BR><B>Subject:</B> =
[TowerTalk]=20
Phasing Harness problem<BR><BR></DIV></FONT>
<DIV><FONT color=3D#000000 size=3D2>This entry is made for friend not =
subscribed=20
to Tower Talk</FONT></DIV>
<DIV><FONT color=3D#000000 size=3D2></FONT> </DIV>
<DIV><FONT color=3D#000000 size=3D2>My friend has 8 over 8 Telrex =
monoband=20
stack on hill top.-</FONT></DIV>
<DIV><FONT color=3D#000000 size=3D2></FONT><FONT size=3D2>this Telrex =
system is from=20
20 years ago using hardwired</FONT></DIV></BLOCKQUOTE></BODY></HTML>
------=_NextPart_000_0002_01BED6B9.34E26A60--
--
FAQ on WWW: http://www.contesting.com/towertalkfaq.html
Submissions: towertalk@contesting.com
Administrative requests: towertalk-REQUEST@contesting.com
Problems: owner-towertalk@contesting.com
Search: http://www.contesting.com/km9p/search.htm
|