Bill:
Yes you can do this. It involves drilling and grouting (expoxy)
reinforcing dowels into the existing footing and incorporating the old
foundation into the new foundation design. In most cases, if the
existing footing is at grade level the new one will be partially above
grade. I would get your local P.E. to fix one up for you as the local
officials will likely get their "knickers in a knot" over this.
73
Hank Lonberg P.E.
- Hank Lonberg, KR7X
- E-mail: hlonberg@europa.com or hank.lonberg@harrisgrp.com
----------------------------------------------------------------
-> Team Pantelleria - IH9P - African Italy - CQWW DX SSB
-> http://www.fortunecity.com/skyscraper/eudora/126/ih9p.html
----------------------------------------------------------------
______________________________ Reply Separator
_________________________________
Subject: [TowerTalk] Concrete Base Experts
Author: "Bill Fisher - W4AN" [SMTP:w4an@contesting.com] at CORPORATE
To: <towertalk@contesting.com>
Date: 4/12/99 1:28 PM
I have a Rohn-45 tower that I am going to replace with LeBlanc & Royle
tower in the near future. The Leblanc tower is much bigger than the
Rohn-45.
I sunk the Rohn in to the ground. Now I need to use a pier pin with the
new tower. I'm wondering if it is safe for me to cut the Rohn-45 off and
pour a slab over the top of the current base for use on the new tower? I
could use part of the 45 base as rebar for the new concrete.
Thanks for any advice.
73
Bill
--
FAQ on WWW: http://www.contesting.com/towertalkfaq.html
Submissions: towertalk@contesting.com
Administrative requests: towertalk-REQUEST@contesting.com
Problems: owner-towertalk@contesting.com
Search: http://www.contesting.com/km9p/search.htm
--
FAQ on WWW: http://www.contesting.com/towertalkfaq.html
Submissions: towertalk@contesting.com
Administrative requests: towertalk-REQUEST@contesting.com
Problems: owner-towertalk@contesting.com
Search: http://www.contesting.com/km9p/search.htm
|