[TowerTalk] Tower base drainage

To: <towertalk@contesting.com>
Subject: [TowerTalk] Tower base drainage
From: kc5ajx@hotmail.com (Rick Bullon)
Date: Thu, 14 Jan 1999 05:07:02 GMT
  A few months ago I tried to get the base for my tower poured. I took a 
week vacation from work and got the holes dug for the base and the 
raised guy posts. Unfortunately UPS lost the base section I order from 
Texas Towers and I couldn't pour the concrete ( Texas Towers shipped me 
another base but it arrived a few days after my vacation ended).
 Since that time every weekend it has rained been too cold ( for me) or 
I had to work until this coming weekend.
  My question is that all this time that I have had the holes dug the 
hole for the tower base has held water ( we hit solid rock at all the 
holes at about 4 feet. I have gravel in the holes as per the Rohn book 
but with the solid rock in the bottom and the heavy red clay around the 
sides of the holes ( the clay goes up the sides of the holes about 1 to 
1 1/2 ft) there is no drainage at the site.
  Now in this part of Texas the low temps don't go below freezing but a 
few times ie no long term freezing weather here.
  Do I need to worry about this water not draining out of the hole?  I 
want to start getting this base done this week end but I don't want to 
screw it up now.
  Thanks in advance More questions to follow when I start raising the 
sections of tower  BTW this is Rohn 25 tower plan on going 70 ft all 
work so far as per the Rohn book.
73 
 Rick
KC5AJX

______________________________________________________
Get Your Private, Free Email at http://www.hotmail.com

--
FAQ on WWW:               http://www.contesting.com/towertalkfaq.html
Submissions:              towertalk@contesting.com
Administrative requests:  towertalk-REQUEST@contesting.com
Problems:                 owner-towertalk@contesting.com
Search:                   http://www.contesting.com/km9p/search.htm


<Prev in Thread] Current Thread [Next in Thread>