I just had a conversation with the contractor who is doing the site
preparation (utilities, etc) for the vacant property we're developing for
our new home/ham site. When I suggested that I would like to have him do
the digging and concrete for the tower footing, he asked if I wanted any
'copper sheathing' in the hole the way he was instructed to do it for
another tower he installed.
Is this something to consider? I don't know whether it was done to get a
great RF ground or for lightning protection (or both). If there is a
worthwhile electrical procedure that can be done in the tower footing, I
sure want to learn more about it before the installation.
Best 73s,
Frank - W0ECS
--