>Owner of commercial tower in South Florida (Built in about 1987,
>EIA222D??) decides to remove two large six foot 2 GHz Grid antennas from
>near top of tower (125 ft) and replace with two smaller two foot 10 GHz
>solid dishes at 80 ft level. PE report says tower in this configuration
>still meets original design criteria.
>
>1. Does owner of tower need to pull building permit for this
>"modification"?
Basic rule of dealing with government:
NEVER involve government unless absolutely necessary. ("Absolutely necessary"
can be loosely defined as when an agent of the government is staning in your
way with a 105 mm and you only have a 50 mm.)
73 - JC,k0hps@amsat.org
"Trust me, I'm from the government, I'm here to help you."
--
FAQ on WWW: http://www.contesting.com/towertalkfaq.html
Submissions: towertalk@contesting.com
Administrative requests: towertalk-REQUEST@contesting.com
Problems: owner-towertalk@contesting.com
|