Towertalk
[Top] [All Lists]

70' HAZER TOWER FEEDBACK.

To: <towertalk@contesting.com>
Subject: 70' HAZER TOWER FEEDBACK.
From: ALSOPB@aol.com (ALSOPB@aol.com)
Date: Tue, 23 Jul 1996 15:44:11 -0400
GUYS,
I'M LOOKING INTO THE 70' TOWER/HAZER ASSEMBLY OFFERED BY GLENN-MARTIN
ENGINEERING.  I'D APPRECIATE ANY FEEDBACK  ANYBODY HAS.
KEEP IN MIND THE HAZER ASSEMBLY ON THIS TOWER IS DIFFERENT FROM THE 50' AND
BELOW TOWERS.  IT HAS ITS OWN SEPARATE TRACK AS OPPOSED TO WRAPPING AROUND
THE TOWER LEGS.

SPECIFIC QUESTIONS I HAVE:

1)OPINION 
2) ASSEMBLY HINTS AND KINKS
3) HOW DID YOU ERECT THE THING AFTER IT WAS ASSEMBLED ON THE GROUND.
4) WOULD YOU/HAVE YOU EVERY CLIMBED IT (EVEN PART WAY)?

73 DE BRIAN /K3KO



<Prev in Thread] Current Thread [Next in Thread>
  • 70' HAZER TOWER FEEDBACK., ALSOPB@aol.com <=