BTW, The code now requires 2 ground rods no closer than 8 feet apart.
> Date: Thu, 26 Jan 2012 07:14:14 -0600
> From: w9cw@yahoo.com
> To: tentec@contesting.com
> Subject: [TenTec] [Ten Tec] Grounds
>
> The deck was in the process of being built when the two Illinois Power
> electrical utility employees installed the buried electrical service to the
> meter, and the ground rod was installed directly beneath the deck within 3
> feet of the house's poured concrete basement wall. Not only did they install
> it where the deck was being built - and, they knew it was being built over
> the ground rod - they provided absolutely no protection to the joint of the
> ground wire from the meter and the 8' copper ground rod. I was present
> watching this, and I told them they should use something, such as Coax Seal
> or whatever they normally use to seal the joint, but they looked at me like I
> was crazy. They hammered the ground rod and ground wire below ground level
> without any joint protection. So, now years later, I am sure that rod/wire
> junction is filled with copper oxide (not a good conductor!), and other
> contaminants. You can't tell these union electrical utility workers anything
> - they know
> it all, or at least they think they do.
>
> 73
> Don W9CW
>
>
> /Technically, a ground wire covered by the deck is a violation of the
> National Electrical Code. Likely the rod was there first, and the deck
> was built over it./
>
> _______________________________________________
> TenTec mailing list
> TenTec@contesting.com
> http://lists.contesting.com/mailman/listinfo/tentec