I am installing a used crank-up/tilt-over tower, an older Tashjian model. My
next step is to finish the tilt-over mechanism and place it all on the already
poured foundation. I have replaced the tilt winch and pulley mounted on the
raising fixture, but there is no cable attachment point present to attach the
cable to the tower leg (about 8 ft high, per the diagram).
What is the correct method/type of hardware to attach the tilt-over cable to
the bottom section tower leg? Obviously, it must allow room for the sections
to nest.
73,
Drew K3PA
________________________________
_______________________________________________
_______________________________________________
TowerTalk mailing list
TowerTalk@contesting.com
http://lists.contesting.com/mailman/listinfo/towertalk
|