| To: | towertalk <towertalk@contesting.com> | 
|---|---|
| Subject: | [TowerTalk] Wanted: M2 Log Periodic Linear Loading Arms | 
| From: | Richard Thorne <rthorne@rthorne.net> | 
| Date: | Wed, 6 Apr 2022 09:38:55 -0500 | 
| List-post: | <mailto:towertalk@contesting.com> | 
| I'm getting close to having all the parts to start an M2 7&10-30LP8 Log 
Periodic build. I'm looking for the machined aluminum linear loading arms that mount on the 3/4" and 1/2" portions of the rear element. These are used to hold the 3/16" linear loading rod in place. If you have the above or other parts from a M2 (not KLM) Log Periodic let me know. Thanks Rich - N5ZC _______________________________________________ _______________________________________________ TowerTalk mailing list TowerTalk@contesting.com http://lists.contesting.com/mailman/listinfo/towertalk | 
| <Prev in Thread] | Current Thread | [Next in Thread> | 
|---|---|---|
| 
 | ||
| Previous by Date: | Re: [TowerTalk] rohn 25 section bolts, Steve Maki | 
|---|---|
| Next by Date: | Re: [TowerTalk] Wanted: M2 Log Periodic Linear Loading Arms, Grant Saviers | 
| Previous by Thread: | [TowerTalk] rohn 25 section bolts, Jamie WW3S | 
| Next by Thread: | Re: [TowerTalk] Wanted: M2 Log Periodic Linear Loading Arms, Grant Saviers | 
| Indexes: | [Date] [Thread] [Top] [All Lists] |