To: | Kelly Taylor <ve4xt@mymts.net> |
---|---|
Subject: | Re: [TowerTalk] Terminate braid at top of tower...or |
From: | Jim Miller <jim@jtmiller.com> |
Date: | Wed, 5 Nov 2014 18:23:16 -0500 |
List-post: | <towertalk@contesting.com">mailto:towertalk@contesting.com> |
At your local big box store they sell PVC door stop molding which makes for great building blocks. I put two small cut pieces of these together and zip tied/taped them to the boom to provide a spacer then zip tied /taped my nice big choke per K9YC prescription on top of that. Easy. Cheap. Works. Jim ab3cv _______________________________________________ _______________________________________________ TowerTalk mailing list TowerTalk@contesting.com http://lists.contesting.com/mailman/listinfo/towertalk |
Previous by Date: | Re: [TowerTalk] Terminate braid at top of tower...or, Kelly Taylor |
---|---|
Next by Date: | Re: [TowerTalk] [Bulk] Rotor cable / Steppir cable connectors, Grant Saviers |
Previous by Thread: | Re: [TowerTalk] Terminate braid at top of tower...or, Jim Thomson |
Next by Thread: | Re: [TowerTalk] Terminate braid at top of tower...or, Jim Miller |
Indexes: | [Date] [Thread] [Top] [All Lists] |