Re: [TowerTalk] Compacted vs. Undisturbed Soil--Summary

To: towertalk@contesting.com
Subject: Re: [TowerTalk] Compacted vs. Undisturbed Soil--Summary
From: Dick Flanagan <dick@k7vc.com>
Date: Wed, 29 Apr 2009 14:04:19 -0700
List-post: <towertalk@contesting.com">mailto:towertalk@contesting.com>
I posted my question regarding compacted vs.undisturbed backfill two 
days ago.  During that time I have received over twenty responses, 
mostly directly.  I would like to summarize those response here and 
in so doing, thank everyone who took the time to share their 
knowledge, experience and opinions with me.  In priority order:

1.  Do what the P.E. says.  He has done the calculations and his 
license and reputation on the line.  If he says compacted soil is 
acceptable for (under his specifications), than you can be assured 
that compacted backfill is acceptable.

2.  Properly done, compacted soil is as strong and in many cases 
stronger than native undisturbed soil.

3.  The specifics of soil compaction relate to the types of fill 
material used, the level of compaction and the depth of each 
compaction step.  A typical example might be to specify well-graded 
gravel, 95% impact compaction and minimum 8" steps.  The P.E. of 
record is responsible for these specifications.

4.  What is not acceptable is to simply dump the excavated soil back 
in the hole and drive over it a few time with a back-hoe tire which 
is done more often than one might think.

In my friend's case, he contacted his P.E. who approved the used of 
backfill so long as it met industry compaction standards which he specified.

I want to thank everyone who contacted me.  The knowledge that is 
available on this forum is absolutely astounding!

Dick


At 11:53 AM 4/27/2009, I wrote:
 >A friend of mine is installing his first tower.  It is a US Tower
 >HDX454.  (I thinks that's the right number.  I have an HDX572 and his
 >is the next one shorter than mine.)
 >
 >He had the tower specs checked by a local PE for the requisite wet
 >stamp needed for his building permit.  The PE calculated and
 >specified a tower footing of 5'x5'x7.5' in undisturbed soil.
 >
 >His contractor dug him a 10'x10'x8' hole and is going to put a
 >5'x5'x8' plywood frame in the hole enclosing the rebar cage.  He is
 >then going to fill the frame with concrete and when it cures is going
 >to remove the frame and back-fill the hole with compacted soil.
 >
 >My friend is being told that properly compacted back-fill is the
 >equivalent of undisturbed soil.  Is that true??
 >
 >Dick
 >--
 >Dick Flanagan K7VC
 >dick@k7vc.com


--
Dick Flanagan K7VC
dick@k7vc.com
_______________________________________________



_______________________________________________
TowerTalk mailing list
TowerTalk@contesting.com
http://lists.contesting.com/mailman/listinfo/towertalk

<Prev in Thread] Current Thread [Next in Thread>