My latest power line rfi I have tracked to 2 poles within 10' of each
other. One or both is scheduled to be replaced. White arrow on the
street, white strip on the pole, was orange tape, and sewer line nearby
marked with green yard tag. Confirmed with utility that it is indeed
scheduled to be replaced but they would not give me a timetable so far.
LOTS of hardware on these 2 poles. So waiting before I track further if
needed. They are old wood poles probably from the 60s.
Does it make any difference as to risk of future rfi whether the pole is
metal or wood (does hardware loosen more often on wood poles)? Just
curious as the new poles they install most or all seem to be metal.
How long do you think I should be patient before I check back with them?
30 days since first email will be 12/18.
Thanks
Chuck
AF4O
_______________________________________________
RFI mailing list
RFI@contesting.com
http://lists.contesting.com/mailman/listinfo/rfi
|