Last week the weathermen predicted a major ice storm, so to minimize potential damage to my station, I lowered the ropes holding my 160m vertical wires and removed the tension at the ends of my KD9SV
I have one single wire Beverage that was installed on the low brush 4-12" above the soil that worked well in a direction I had RFI from a neighbor. It is now under 4' of snow and ice and appears to w
I suggest you join both posts together, otherwise the reactance of the T1 secondary (hi-Z side of reverse direction xfmr) will be in series with the beverage if primary disconnected. Shorting or load