- 1. Topband: 9M0W Day 2 on 160M - A Better Showing (score: 1)
- Author: k1zm--- via Topband <topband@contesting.com>
- Date: Tue, 13 Mar 2018 21:27:01 -0400
- At sunrise after breakfast Krassy and I.wired in a 180 delay transformer that could be switched from the operating position to switch the 2 el array from BROADSIDE to end FIRE - and also to unidirect
- /archives//html/Topband/2018-03/msg00052.html (10,625 bytes)
This search system is powered by
Namazu