- 1. [TowerTalk] Trenching & PVC (score: 1)
- Author: w1pdi--- via TowerTalk <towertalk@contesting.com>
- Date: Sun, 28 Jan 2018 20:09:45 -0500
- Im finalizing my list of whats needed for my tower projectand what needs to be done either before or after the tower is up. Routing of 4 coax and rotor cable has to be decided. Eithertrench approx. 1
- /archives//html/Towertalk/2018-01/msg00277.html (8,454 bytes)
- 2. Re: [TowerTalk] Trenching & PVC (score: 1)
- Author: "Gene Smar" <ersmar@verizon.net>
- Date: Sun, 28 Jan 2018 22:36:14 -0500
- Tom: I can offer a solution for one of your issues. If you can fit it in, instead of a 90-degree elbow, install a pullbox. That'll give you sufficient room to pull the cable into the box then make th
- /archives//html/Towertalk/2018-01/msg00281.html (9,335 bytes)
- 3. Re: [TowerTalk] Trenching & PVC (score: 1)
- Author: Grant Saviers <grants2@pacbell.net>
- Date: Sun, 28 Jan 2018 20:06:02 -0800
- "Sharp and sweeping" turns are a bit confusing as to actual possible radii of the turn. For 125' run a two 90 deg large radius (36") sweeps of 3" conduit all should be ok for 4 RG8 size coax and rota
- /archives//html/Towertalk/2018-01/msg00285.html (10,095 bytes)
This search system is powered by
Namazu