- 1. Re: [TowerTalk] TowerTalk Digest, Vol 68, Issue 77 (score: 1)
- Author: "Michael Fox \(K5MEF\)" <k5mef@mefox.org>
- Date: Fri, 29 Aug 2008 17:00:00 -0700
- Uh, well, all of the answers were posted here to the reflector. The short summary is to tape or tie-wrap to the tower leg - various experiences and cautions with each method. 73, Michael - K5MEF -- A
- /archives//html/Towertalk/2008-08/msg00635.html (7,533 bytes)
This search system is powered by
Namazu