Search String: Display: Description: Sort:

Results:

References: [ +subject:/^(?:^\s*(re|sv|fwd|fw)[\[\]\d]*[:>-]+\s*)*\[TowerTalk\]\s+Pour\s+Complete\s*$/: 11 ]

Total 11 documents matching your query.

1. Re: [TowerTalk] Pour Complete (score: 1)
Author: "Anthony J. Cioffi \(N2KI\)" <n2ki@amsat.org>
Date: Thu, 2 Sep 2010 14:59:08 -0400
Let the curing begin! All is done for now here. That had to be some of the hardest work I have done in a long while. 8.5 cubic yards of 4000psi concrete. Next step is to put together the tower sectio
/archives//html/Towertalk/2010-09/msg00079.html (10,791 bytes)

2. Re: [TowerTalk] Pour Complete (score: 1)
Author: k2qmf@juno.com
Date: Thu, 2 Sep 2010 15:16:47 -0400
Hello Anthony, I am not an expert on tower installation but I see two things that "could" be a problem. First, they say to pour concrete into a hole against undisturbed soil without a wood frame!! Yo
/archives//html/Towertalk/2010-09/msg00081.html (11,545 bytes)

3. Re: [TowerTalk] Pour Complete (score: 1)
Author: "Roger (K8RI)" <K8RI-on-TowerTalk@tm.net>
Date: Thu, 02 Sep 2010 16:17:54 -0400
Many times this is not an option. My tower base was certainly undisturbed soil. It took me two days to dig the hole, but the guy anchors required forms. After digging the holes which looked good, I w
/archives//html/Towertalk/2010-09/msg00083.html (15,308 bytes)

4. Re: [TowerTalk] Pour Complete (score: 1)
Author: "Mark Robinson" <markrob@mindspring.com>
Date: Thu, 2 Sep 2010 16:36:28 -0400
I thought that I was going to loose the walls on one of my guy anchor holes when it started to fill with water but I was able to pump it out twice a day. When a mole decided to enter the hole at the
/archives//html/Towertalk/2010-09/msg00084.html (17,464 bytes)

5. Re: [TowerTalk] Pour Complete (score: 1)
Author: "Mark Robinson" <markrob@mindspring.com>
Date: Thu, 2 Sep 2010 16:39:07 -0400
That picture of you digging your base hole by hand spurred me on to dig mine by hand too. What a job but it was nice and square. I hired a digger and operator for the three guy anchor holes Mark N1UK
/archives//html/Towertalk/2010-09/msg00085.html (16,837 bytes)

6. Re: [TowerTalk] Pour Complete (score: 1)
Author: Steve WU9B <wu9b@desertinet.com>
Date: Thu, 2 Sep 2010 15:38:01 -0700
Hope you remembered to write your call in the concrete! 73, Steve WU9B _______________________________________________ _______________________________________________ TowerTalk mailing list TowerTalk
/archives//html/Towertalk/2010-09/msg00086.html (8,232 bytes)

7. Re: [TowerTalk] Pour Complete (score: 1)
Author: K7LXC@aol.com
Date: Thu, 2 Sep 2010 19:06:51 EDT
of the hardest work I have done in a long while. 8.5 cubic yards of 4000psi concrete. Next step is to put together the tower sections. Probably over the weekend. More pictures Congrats!! Let the FUN
/archives//html/Towertalk/2010-09/msg00092.html (7,667 bytes)

8. Re: [TowerTalk] Pour Complete (score: 1)
Author: K7LXC@aol.com
Date: Thu, 2 Sep 2010 19:15:37 EDT
Yep. We also try to sacrifice a rare DX QSL card in the bottom as a signal catching talisman. Couldn't hurt. Cheers, Steve K7LXC _______________________________________________ _____________________
/archives//html/Towertalk/2010-09/msg00093.html (7,558 bytes)

9. Re: [TowerTalk] Pour Complete (score: 1)
Author: "Gene Smar" <ersmar@verizon.net>
Date: Thu, 02 Sep 2010 23:25:42 -0400
Anthony: FWIW - I just helped the daughter of a SK up the street from me locate a buyer for her dad's crank-up tower. It was removed a couple of weeks ago. The tower was a 72-footer witha KT-34XT ato
/archives//html/Towertalk/2010-09/msg00096.html (15,396 bytes)

10. Re: [TowerTalk] Pour Complete (score: 1)
Author: "Anthony J. Cioffi \(N2KI\)" <n2ki@amsat.org>
Date: Fri, 3 Sep 2010 07:23:36 -0400
Gene, et al, Thank you guys for the information. The tower position had to be located in this area due to the village Building Inspector. Originally, it was going at the end of the driveway. Anyway,
/archives//html/Towertalk/2010-09/msg00101.html (16,954 bytes)

11. Re: [TowerTalk] Pour Complete (score: 1)
Author: "Roger (K8RI)" <K8RI-on-TowerTalk@tm.net>
Date: Fri, 03 Sep 2010 08:31:10 -0400
I don't see anything wrong with the tower location. Poor technique. The back hoe operator dug the holes for my anchors almost at the size I specified. Unfortunately the soil was not structurally soun
/archives//html/Towertalk/2010-09/msg00105.html (20,195 bytes)


This search system is powered by Namazu