Search String: Display: Description: Sort:

Results:

References: [ +subject:/^(?:^\s*(re|sv|fwd|fw)[\[\]\d]*[:>-]+\s*)*\[TowerTalk\]\s+Control\s+cable\s+Grounding\s*$/: 6 ]

Total 6 documents matching your query.

1. [TowerTalk] Control cable Grounding (score: 1)
Author: jlangdon@outer.net (John Langdon)
Date: Wed, 4 Nov 1998 06:28:01 -0600
Snip SNIP When I installed my tower and grounding system, I bugged two good friends (and PolyPhaser engineers) for help every step of the way. On the subject of the number and position of lightning p
/archives//html/Towertalk/1998-11/msg00076.html (8,121 bytes)

2. [TowerTalk] Control cable Grounding (score: 1)
Author: dick@libelle.com (Dick Flanagan)
Date: Wed, 4 Nov 1998 05:56:55 -0800
I agree. In my case, however, the run is less than 75'. 73, Dick -- Dick Flanagan W6OLD CFII Minden, Nevada DM09db (South of Reno) Visit http://www.qsl.net/cvrc/ -- FAQ on WWW: http://www.contesting.
/archives//html/Towertalk/1998-11/msg00077.html (8,103 bytes)

3. [TowerTalk] Control cable Grounding (score: 1)
Author: Dick Green" <dick.green@valley.net (Dick Green)
Date: Wed, 4 Nov 1998 10:41:17 -0500
One problem is that the Polyphaser suppressors are not weatherproof. That means you have to build a weatherproof enclosure of some sort for them at the top of the tower. I didn't put a suppressor at
/archives//html/Towertalk/1998-11/msg00082.html (9,337 bytes)

4. [TowerTalk] Control cable Grounding (score: 1)
Author: w8ji.tom@MCIONE.com (w8ji.tom)
Date: Wed, 04 Nov 1998 19:42:53 -0500
Hi John and All, the shack, even if and the >cables are buried, you should put a suppressor at the base of the tower AND at the entrance to the >shack. A lot of this stuff is common sense in dressing
/archives//html/Towertalk/1998-11/msg00095.html (8,607 bytes)

5. [TowerTalk] Control cable Grounding (score: 1)
Author: donald.s.tucker@exgate.tek.com (donald.s.tucker@exgate.tek.com)
Date: Wed, 4 Nov 1998 17:11:05 -0800
Tom, Dropping lines down a pull or push-up is not feasible (I understand the reason for putting them inside). Suggestions for we who must use pull or push up towers? In fact, making the question even
/archives//html/Towertalk/1998-11/msg00096.html (10,451 bytes)

6. [TowerTalk] Control cable Grounding (score: 1)
Author: w8ji.tom@MCIONE.com (w8ji.tom)
Date: Thu, 05 Nov 1998 08:46:57 -0500
Hi Don, At broadcast stations, properly designed installations have lightning retarding loops in cables or feed wires whenever possible. The idea is to add a high common-mode series impedance, since
/archives//html/Towertalk/1998-11/msg00108.html (9,736 bytes)


This search system is powered by Namazu