- 1. Topband: CQ160 Rule Changes 2003 Multi-op On Time` (score: 1)
- Author: user@john-dunnington.freeserve.co.uk (John Dunnington)
- Date: Sun, 26 Jan 2003 19:23:38 -0000
- Hello All Following the suggestion all multi-ops keep to 36-hrs I can see little point in operating from this side after our S/R Circa 0800z and S/S 1630z. Given exceptional conditions maybe up to 1-
- /archives//html/Topband/2003-01/msg00091.html (7,035 bytes)
This search system is powered by
Namazu