- 1. Topband: Battle Creek Special problems (score: 1)
- Author: "Tom Hoyer" <hoyer@netreach.net>
- Date: Wed, 3 Dec 2003 20:27:35 -0500
- I recently built the tube version of the BCS. I used 2" dia tubing up to the 40m trap then transitioned to 1.5" tubing upt to the 80m trap. I followed the LC type trap guidelines in ON4UN's book. Bot
- /archives//html/Topband/2003-12/msg00019.html (7,276 bytes)
This search system is powered by
Namazu