A vibrator  is the best way to go, however as long as you are diligent you can 
use a length of 2x4 to tamp the concrete every 6 inches or so of lift as the 
concrete is poured. Hard to keep up with a fast pour coming off a truck. You'll 
probably want 4 tampers going all the time and a relatively slow pour rate. Be 
sure to reward them with appropriate fuel.
Good luck, K7MEI> Date: Thu, 16 Aug 2007 08:34:44 -0700> From: 
dana.roode@gmail.com> To: towertalk@contesting.com> Subject: [TowerTalk] 
Vibrator for 2x2x4 hole?> > Folks - for a 2x2x4' Rohn 25 base concrete 
foundation, do I need to> use a concrete vibrator during the concrete pour?> > 
dana> _______________________________________________> > > > 
_______________________________________________> TowerTalk mailing list> 
TowerTalk@contesting.com> http://lists.contesting.com/mailman/listinfo/towertalk
_______________________________________________



_______________________________________________
TowerTalk mailing list
TowerTalk@contesting.com
http://lists.contesting.com/mailman/listinfo/towertalk

<Prev in Thread] Current Thread [Next in Thread>