At 09:58 AM 9/16/97 -0400, K5RC wrote:
>I've also received my "welcome" to Nevada, trying to put in my first tower
>base. As you mention, after six inches it is rock and more rock. I took a
>queue from my elmer, Sam Harris, W1FZJ, who was never encumbered by natural
>obstacles. I cut down a pine tree with an 8" base, placed the Rohn base
>section over it, secured the tower to the tree with angle iron, placed a 2' x
>2' x 2' wooden form around the whole thing and poured it full of concrete.
Tom, I am afraid that the tree stump will rot out in a few years leaving
your tower base very unstable and dangerous.
In New York, my QTH had a solid rock shelf (Or a rock as big as Rhode
Island) down about 18 inches. The rock shelf was everywhere. To install
tower bases I dug down to the rock shelf, drilled three holes down a couple
of feet, put 1" steel rods in the holes, set up and aligned the tower base,
then framed and poured concrete around it all. For guy anchors I drilled
holes and used the expandable rock anchors. The end result was a very solid
tower installation.
Remember the main purpose of the tower base for a guyed tower is to prevent
lateral movement. Good luck.
73, Richard
K5NA@BGA.COM
http://www.realtime.net/~k5na
--
FAQ on WWW: http://www.contesting.com/towertalkfaq.html
Submissions: towertalk@contesting.com
Administrative requests: towertalk-REQUEST@contesting.com
Problems: owner-towertalk@contesting.com
Search: http://www.contesting.com/km9p/search
|