That is a great idea Jon, easier than my waiting for the concrete to
partially set method and hoping that the pin does not sink.
John KK9A
Jon Zaimes AA1K wrote:
The Rohn spec is to leave 4" exposed.
I use a U-bolt to clamp the rod to a piece of aluminum or steel angle that I
place diagonally across the form, checking measurement on the other diagonal
to make sure it is centered. I place this shortly after concrete is poured.
73/Jon
Jon P. Zaimes, AA1K Tower climber for hire http://www.aa1k.us/ Cell:
302-632-2353email: jz73 at verizon.net or aa1k at arrl.net
_______________________________________________
_______________________________________________
TowerTalk mailing list
TowerTalk@contesting.com
http://lists.contesting.com/mailman/listinfo/towertalk
|