Situation I have been given an 8 section tower. 1/2 of the bottom section is cemented into the base. We will take the tower top seven sections down, then saw off the legs of the bottom section at the cement base. Question Was this an approved method of installing a tower? Will it be better to purchase the three factory legs to place into the cement base. AC0LD _______________________________________________ _______________________________________________ TowerTalk mailing list TowerTalk@contesting.com http://lists.contesting.com/mailman/listinfo/towertalk |
<Prev in Thread] | Current Thread | [Next in Thread> |
---|---|---|
|
Previous by Date: | Re: [TowerTalk] Looking for old Triex CZ-471 tower engineering plans and drawings, Ray Benny |
---|---|
Next by Date: | [TowerTalk] "Question of the Day" from the Antenna Farm, John King |
Previous by Thread: | [TowerTalk] Looking for old Triex CZ-471 tower engineering plans and drawings, Ray Benny |
Next by Thread: | Re: [TowerTalk] TOWER BASE CREATION, K7LXC |
Indexes: | [Date] [Thread] [Top] [All Lists] |