To: | "Roger D Johnson" <n1rj@adelphia.net>, <topband@contesting.com> |
---|---|
Subject: | Re: Topband: Building a practical vertical from Al tubing |
From: | "Brad Rehm" <brehm@ptitest.com> |
Reply-to: | brehm@ptitest.com |
Date: | Thu, 5 Jan 2006 13:06:49 -0600 |
List-post: | <mailto:topband@contesting.com> |
""I used 440 lb baler twice (1/2 cent per foot) so I could put in as much guying as I wanted for practically no cost."" "...how to attach the guys to the vertical." 73, Roger I also used baling twine--2200 ft. for about $18. It's fastened at various levels using the guy rings that are sold for TV masts. The rings are supported by hose clamps, and the guys are protected from chafing by small thimbles that fit through the holes in the guy rings. 73, Brad, KV5V _______________________________________________ Topband mailing list Topband@contesting.com http://lists.contesting.com/mailman/listinfo/topband |
<Prev in Thread] | Current Thread | [Next in Thread> |
---|---|---|
|
Previous by Date: | Re: Topband: Building a practical vertical from Al tubing, herbs |
---|---|
Next by Date: | Topband: Reflector Messages, Bill Tippett |
Previous by Thread: | Re: Topband: Building a practical vertical from Al tubing, Logan Dietz |
Next by Thread: | Re: Topband: Building a practical vertical from Al tubing, Donald Chester |
Indexes: | [Date] [Thread] [Top] [All Lists] |